Driving Project Success
Through Precision Electrical Prefabrication
At Zenith Systems, we’re proud to operate the largest electrical and technology prefabrication center in Northeast Ohio. Outfitted with cutting-edge technology and staffed by highly skilled craft personnel, our facility supports advanced electrical prefabrication strategies that give us control of the build process long before materials reach the job site. Operating in a controlled environment allows us to reduce safety risks, eliminate weather-related delays, and accelerate project delivery — all while maintaining the highest standards of quality control.
Request a Free Consultation
Our Electrical Prefabrication Services
- State-of-the-Art Fabrication Center: A dedicated facility with advanced tools and expert professionals to manage all prefabrication needs.
- Controlled Fabrication Environment: All fabrication takes place indoors, free from external disruptions such as weather or site hazards.
- Precision Tooling Stations: Advanced stations ensure efficient production of consistent, high-quality components.
- Just-in-Time (JIT) Delivery: Fabricated components delivered exactly when needed.
- Customized Prefabricated Assemblies: Solutions tailored to the specific requirements of each project.
- High-Quality Results: Every component is produced in a controlled environment to meet rigorous quality standards before arriving on-site.
- Enhanced Job Site Safety: Less on-site assembly reduces exposure to risks and eliminates delays from weather conditions.
- Accelerated Installation: Prefabricated assemblies streamline installation, saving valuable time on-site.
- Efficiency & Cost Savings: Reduced material waste and optimized scheduling keep projects on time and within budget.
- Seamless Integration: Custom-built assemblies ensure precise fit and function, eliminating costly on-site adjustments.
Marymount Hospital Infrastructure
The objective for this project was to construct a new electrical powerhouse as an addition to the existing hospital.
Marymount Hospital Surgical Facility
Highlights of this project include a new 3-story Surgery Center addition, along with 30,000 square feet of renovation to the surgical support area of the existing hospital, which was to be constructed in 4 phases.