Delivering Trusted Fire Alarm Solutions
For Critical Protection
At Zenith, safety is more than a priority — it’s a commitment. Fire alarm systems are critical to safeguarding lives, property, and the infrastructure that supports our communities. As a trusted fire alarm installation company, we deliver everything from straightforward smoke detection networks to complex fire command centers. Our dedicated team — including NICET Level III-certified professionals — is ready to provide dependable solutions at a moment’s notice.
Request a Free Consultation
Our Fire Alarm Installation Services
- Custom Fire Alarm System Design: Tailored solutions for facilities of every size, from small businesses to expansive campuses.
- Code Compliance & Coordination: Direct collaboration with local fire departments and AHJs to guarantee compliance.
- Expert Installation & Maintenance: Certified professionals ensuring reliable installation and ongoing system care.
- Advanced Testing & Certification: Utilizing state-of-the-art tools and processes to certify system readiness.
- 24/7 Emergency Support: Round-the-clock response to address urgent system needs without delay.
- Tailored Safety Solutions: Systems designed to meet your specific needs, ensuring comprehensive protection.
- Regulatory Peace of Mind: Confidence knowing your system meets all local and national safety codes.
- Reliable Performance: Fire alarm systems built for precision, safety, and long-term durability.
- Compliance Assurance: Verification that your fire alarm system meets or exceeds industry standards.
- Uninterrupted Protection: Immediate support to maintain safety and minimize downtime during emergencies.
Marymount Hospital Infrastructure
The objective for this project was to construct a new electrical powerhouse as an addition to the existing hospital.
Marymount Hospital Surgical Facility
Highlights of this project include a new 3-story Surgery Center addition, along with 30,000 square feet of renovation to the surgical support area of the existing hospital, which was to be constructed in 4 phases.